Project

Connectivity for the Izykhsky open-pit mine

Connectum designed an Izykhsky Mine network using Tropos, HUBER+SUHNER antennas, and Cambium bridges to connect mobile equipment to Karier.

Connectivity for the Izykhsky open-pit mine

Site

  • Coal production: 1 million metric tons/year.
  • Length: 7 km.
  • Area: 48 km².

Requirements

Continuous monitoring and data collection from mobile equipment for Karier, an automated mining fleet management system, including robotic BelAZ trucks in the test area.

Technical solution

  • 9 Hitachi Energy Tropos 6420 base stations with mesh technology (coverage across the entire site without dead zones and automatic network reconfiguration).
  • 30 ABB Tropos 4310 mobile terminals with HUBER+SUHNER antennas (reliable connectivity on the move) for mobile equipment, plus Cambium PtP450i wireless bridges for high-speed data transmission between different parts of the complex.

Connectum’s scope of work

  • Wireless network design.
  • Equipment supply.
  • Integration with the Karier dispatch system.
Infrastructure for the “Connectivity for the Izykhsky open-pit mine” project
Site infrastructure

Results

Operational efficiency: data collection and analytics from mobile equipment, with real-time tracking of equipment metrics and positions.