Project

Tropos network at the Novoshakhtinsky open-pit mine

Tropos base stations and mobile terminals connect Novoshakhtinsky Mine equipment to the Karier dispatch system for telemetry and position tracking.

Tropos network at the Novoshakhtinsky open-pit mine

Site

  • Coal production: 3.5 million metric tons/year.
  • Area: 30 km²; length: 10 km.

Requirements

Continuous data transmission from mobile equipment for the Karier automated dispatch system.

Technical solution

  • 16 fixed Hitachi Energy Tropos 6420 base stations with mesh support for automatic traffic routing to the fiber-optic connection point.
  • 80 Hitachi Energy Tropos 4310 mobile terminals with HUBER+SUHNER antennas.

Connectum’s scope of work

  • Wireless network design.
  • Equipment supply.
  • Integration with the Karier dispatch system.
Infrastructure for the “Tropos network at the Novoshakhtinsky open-pit mine” project
Site infrastructure

Results

Operational efficiency: data collection and analytics from mobile equipment, with real-time tracking of equipment metrics and positions.