Handheld terminals lose the session
Operations freeze or require sign-in again when workers move between aisles.
Wireless network for warehouse logistics
We design Wi‑Fi for WMS, handheld terminals, forklifts and other mobile equipment in all working areas of the warehouse: we take into account the geometry of the racks and actual filling, check client devices, conduct route tests and document acceptance criteria in advance.
Warehouse areas → handheld terminals → forklifts → radio access → WMS
Warehouse Wi‑Fi supports handheld terminals, WMS-dependent workflows, forklifts, printers, and other equipment in a changing RF environment. We design for device operating heights, aisles, and movement routes, then perform acceptance tests on the client devices actually used. The WMS is a separate information system and is not included in Wi‑Fi delivery.
Signs that a solution is needed
Operations freeze or require sign-in again when workers move between aisles.
Receiving, picking, and shipping data arrives inconsistently in particular areas.
The onboard terminal loses communication on turns, ramps or between buildings.
The empty warehouse passes the test, and after filling the shelves there are failures.
Features of the site
RF environment changes along with the product, equipment and mode of operation.
Metal racks create narrow propagation paths and multiple reflections.
Differences in goods density and moisture content change signal attenuation in aisles.
An antenna near the roof may cover the hall but provide insufficient signal at handheld terminal height.
The transition between the inner and outer zones requires separate verification of coverage and roaming.
The speed of the forklift, the position of the cab and the installation of the onboard antenna affect the stability of the communication.
Inspection and installation are planned by zones in order not to stop the existing warehouse.
Operating scenarios
Receiving, putaway, picking, and inventory workflows without reconnection in aisles.
The continuity of the application session is checked at the onboard terminal by agreed routes, including ramps, gates and transitions between zones.
Transmission of tasks and telemetry for autonomous vehicles with separate delay criteria.
Mobile label printing, quality control and service operations.
For voice picking, latency, jitter, and packet loss limits are agreed in advance. Testing then uses the actual headset and client device.
Architecture of the warehouse
Handheld terminals, onboard computers, printers, telephones and AGV.
Access points and antennas oriented to passageways and working heights.
Switches, PoE, structured cabling system or fiber-optic communication lines between zones and enclosures.
Controller, authentication, segmentation and application traffic priority.
Monitoring of points, clients, transitions and communication quality by zones.
Key mechanisms
| Mechanism | What it does | What we check |
|---|---|---|
| Directional coverage | It forms radio zones along the aisles and reduces unnecessary mutual influence. | Signal strength and quality at the actual client device operating height. |
| Mechanisms of fast roaming | Network roaming mechanisms help compatible clients move faster between access points. | Behavior of specific handheld terminals and onboard terminals on the route. |
| Mobile node | It is used as a separate onboard solution after checking the client device, antenna and working route. | Antenna mounting, motion speed and application requirements. |
| Segmentation and QoS | Separates production traffic and gives it priority. | Access policies, load profile and actual losses. |
Stages of the project
Get heights, racks, materials, zones, routes and a list of devices.
Measure the RF environment, inspect cable routes, and verify equipment placement conditions.
Build the RF model and, where needed, validate critical aisles with a temporary installation.
We expand the network by zones, taking into account the schedule of the warehouse.
Check handheld terminals, forklifts and applications in working conditions.
Results of the project
Acceptance
| Criterion | How to check | Where we document |
|---|---|---|
| Work areas | Take measurements in rack aisles, on ramps, and in receiving and shipping areas. | Heat map and checklist. |
| Handheld terminals | Run an agreed WMS workflow on the terminal model used on site. | Test log and list of tested devices. |
| Forklift | Drive the agreed route using the onboard client device. | Transition log and application session continuity. |
| Load | Check during working hours or with a consistent traffic model. | Indicators of delay, loss and throughput. |
Operation
Connection and roaming events help to find problems of specific models.
Channels, transmit power, and software versions are changed through agreed procedures rather than ad hoc adjustments.
Handheld terminals, mobile equipment, staff devices, and guest devices receive separate policies.
After remodeling the racks or changing the assortment, critical areas are checked again.
The schedule is defined after reviewing project inputs and, where necessary, surveying the site. Design, delivery, installation, commissioning, and acceptance are planned separately.
Cost depends on location, areas to be covered, the client device mix, cabling and backbone condition, equipment, work, and integrations. We document the estimate after defining the project scope.
Response targets, support arrangements, monitoring, spare equipment, and restoration procedures are agreed separately according to the criticality of operations.
Questions and answers
Goods, metal racks, and equipment change signal attenuation, reflection, and propagation along aisles. The predictive model therefore accounts for materials, storage height, and typical stock levels. Final measurements use conditions representative of operations. Significant changes to goods, storage density, or rack layouts require critical areas and routes to be retested against agreed criteria.
Work can often be divided by area, shift, and agreed service window, but feasibility is confirmed after a site survey. Before starting, we document access, safety requirements, permitted temporary switching, and areas where installation cannot take place during operations. Each stage also has agreed verification, rollback, and operational handover procedures.
Testing every individual device is usually unnecessary, but the program includes common and critical models with their operating firmware and typical settings. Terminals differ in sensitivity, supported network features, roaming algorithms, and power saving. Results for one model cannot automatically be applied to the whole fleet. Devices and workflows to be tested are agreed before acceptance.
No. This solution covers the wireless infrastructure on which WMS workflows depend. The network project documents application connectivity requirements, client devices, and operating routes, then tests data exchange on handheld terminals through agreed workflows. WMS selection, deployment, configuration, and maintenance remain a separate project scope.
Testing uses the target onboard terminal, its installed antenna, and an agreed operating route. We record network metrics, connection events, and application session behavior on turns, ramps, at doors, and between areas where included in the project. Successful test criteria, driving speed, and route start and end points are defined before acceptance.
Not necessarily. Too many access points may increase interference without addressing client device, antenna, or wired infrastructure issues. First we check the RF environment, channel plan, transmit power, placement, antenna types, backbone condition, and client device fleet. We then determine whether to add or relocate access points, change settings, or test a specific route further.
Provide a warehouse plan, ceiling and storage heights, rack layout, typical stock levels, working areas, and equipment routes. A list of handheld and onboard terminals, WMS-dependent workflows, existing structured cabling, fiber links and Wi‑Fi, installation restrictions, and survey windows is also useful. Missing inputs are clarified before estimating the scope.
Consider a repeat survey after substantial rack changes, changes to storage height or type, new equipment, replacement of common terminal models, or persistent complaints in particular areas. The scope depends on the changes: some need only a few routes and checkpoints retested; major reconfiguration may require a model update and broader coverage measurements.
The next step
Send a plan with heights and racks, a list of handheld terminals, forklifts and critical operations. We will clarify the data and suggest the next engineering step.
Material prepared by Connectum technical team · updated: August 2026