An up-to-date, approved design is available
Versions of plans, specifications, schemes, configuration requirements and acceptance programs are defined prior to the start of work.
Implementation of the approved project
We verify site readiness and the current design, carry out agreed installation and configuration work, perform tests, and hand over the operational documentation. Equipment supply, structured cabling, fiber-optic links, integrations, warranties, and other contractors’ responsibilities are defined before work starts on site.
Project → readiness → installation → configuration → testing → as-built documentation package
Wi‑Fi deployment implements an approved design: readiness checks, installation and connections within the agreed scope, configuration loading and verification, integration, acceptance testing, and document handover. Design defines the target solution; deployment carries it out through a controlled process. Equipment supply, structured cabling, fiber-optic links, other contractors’ work, warranties, and support are included only when expressly stated in the contract.
Versions of plans, specifications, schemes, configuration requirements and acceptance programs are defined prior to the start of work.
Places, structures, access, security, power, ports, routes and related works are confirmed.
At an operating site, we agree on phasing, service impact, backups, and rollback procedures.
Responsible contacts are appointed for the LAN, information security, directories, certificates, applications, and final tests.
| Validation | What you need | Results |
|---|---|---|
| Design and changes | Current version, approvals, register of deviations | A verified basis for deployment |
| Equipment and supply | Completeness, models, versions and status | Register of readiness and non-conformities |
| Place of installation | Access, mounting arrangements, heights and environmental conditions | Permission for installation or list of blockers |
| Backhaul and power supply | Structured cabling system, fiber-optic communication lines, ports, PoE, racks and markings | Confirmed connection points |
| Integrations | VLAN, addressing, accesses, authentication and connection points to the systems listed in the approved project | Responsibility and readiness matrix |
| Acceptance | Scenarios, clients, routes, criteria and participants | Approved test program |
We check the project, site, delivery, access and related dependencies; blockers are not masked by installation.
We work on the current documentation and record the actual location and connections.
Apply the agreed configuration, save versions and backups within the contractual boundaries.
Verify interfaces, access permissions, and party responsibilities; connect only the systems included in the approved scope.
Test only the agreed areas, client devices, routes, failure scenarios, and applications.
We hand over as-built documents, access permissions, backups, a register of outstanding issues and defined areas of responsibility.
| Included in the base scope | Agree separately | Not included automatically |
|---|---|---|
| Readiness checks, installation, configuration, testing, and as-built documentation within the approved scope | Supply of equipment, structured cabling system, fiber-optic communication lines, construction works, lifting equipment | Correcting an incomplete design without an agreed change |
| Version control and recording deviations | Special work windows, migration without service interruption, and additional sites | Support after network handover |
| Handover of operational documentation | Integration and work of third parties | Manufacturer's warranty on equipment from Connectum, unless it is stipulated by the contract |
| Criterion | How to check | Where we document |
|---|---|---|
| Installation and labeling | Check the actual location and connections with the current project | As-built diagram and equipment register |
| Configuration | Verify versions, segments, policies and backups in the agreed composition | Configuration Control Sheet |
| Radio layer | We perform measurements according to the approved program | Measurement reports and maps, where included in acceptance |
| Client device workflow | Check specific devices, routes and applications | Application test report |
| Failure and rollback | Check only the agreed safe scenarios | Test program and change log |
| Handover | We verify documents, accesses and areas of responsibility | Handover certificate or checklist |
Connectum’s workmanship warranty, the manufacturer’s equipment warranty, and technical support are separate commitments. The contract defines the basis, scope, term, exclusions, request channel, and responsible party for each. Support after network handover begins only under a separately agreed service model.
The estimate depends on the number and mounting heights of access points, readiness of structured cabling, fiber-optic links and power supply, site conditions, equipment delivery completeness, access arrangements, maintenance windows, integrations, migration requirements, and acceptance test scope. An estimate requires a current design, specification, readiness information, and the proposed phasing.
Questions and answers
We assess this after reviewing the documentation and contractual rights to use it. Before estimating the work, we check plans, specifications, mounting locations, connections, configuration requirements, contractor responsibilities, and the acceptance program. Gaps and changes are recorded separately. Resolving them is not included in installation until the scope, responsibilities, and current design version are agreed.
Phased work can accommodate maintenance windows and critical services, but zero downtime cannot be promised before the architecture and dependencies have been assessed. For each change, we agree on the expected impact, backups, switching sequence, success criteria, and rollback procedure. Site, customer, and related system restrictions are documented before work begins and incorporated into the deployment program.
Deployment requires a current design, agreed site access, prepared mounting locations, backhaul and power infrastructure, or a clear allocation of responsibility for these tasks. Responsible contacts must also be appointed for the LAN, information security, authentication, applications, and acceptance. If the customer or another contractor supplies equipment, completeness, models, versions, delivery condition, and responsibility for discrepancies are checked before installation.
The contract defines the as-built documentation package. It may include plans and diagrams, an equipment and connection register, configuration versions, backups in an agreed format, test reports, a list of deviations and operating instructions. Passwords, keys and other sensitive information are excluded from the general archive and transferred separately through a secure procedure agreed in advance.
Connectum's warranty on its own work, the manufacturer's or supplier's equipment warranty and subsequent technical support have different grounds, periods and exclusions. The contract separately defines who handles requests, what qualifies as a warranty case, required documents, permissible changes and diagnostic procedures. Support does not start automatically after network handover; it is arranged under a separately agreed service model.
Each deviation is recorded against a specific criterion, the test conditions, and the current design version. We then identify the possible cause and the party responsible for the next action, whether it concerns installation, configuration, inputs, equipment, or a related system. Retesting follows the agreed correction. Additional work, design changes, and extensions to the original scope are agreed separately before implementation.
The next step
Send up-to-date design, specification, site plans, structured cabling system readiness and power supply, access restrictions and desired stage. We will return the list of missing data and evaluation boundaries.
Material prepared by Connectum technical team · updated: August 2026