Implementation of the approved project

Wi‑Fi Network Installation, Commissioning, and Deployment

We verify site readiness and the current design, carry out agreed installation and configuration work, perform tests, and hand over the operational documentation. Equipment supply, structured cabling, fiber-optic links, integrations, warranties, and other contractors’ responsibilities are defined before work starts on site.

Stages of implementation of Wi-Fi networkThe project undergoes readiness testing, installation, configuration, testing and transmission of operational documentation.

Project → readiness → installation → configuration → testing → as-built documentation package

What does Wi‑Fi deployment involve?

Wi‑Fi deployment implements an approved design: readiness checks, installation and connections within the agreed scope, configuration loading and verification, integration, acceptance testing, and document handover. Design defines the target solution; deployment carries it out through a controlled process. Equipment supply, structured cabling, fiber-optic links, other contractors’ work, warranties, and support are included only when expressly stated in the contract.

When deployment can begin

01

An up-to-date, approved design is available

Versions of plans, specifications, schemes, configuration requirements and acceptance programs are defined prior to the start of work.

02

The site is ready for installation

Places, structures, access, security, power, ports, routes and related works are confirmed.

03

Work windows and dependencies are defined

At an operating site, we agree on phasing, service impact, backups, and rollback procedures.

04

People responsible for integrations and acceptance are appointed

Responsible contacts are appointed for the LAN, information security, directories, certificates, applications, and final tests.

Readiness checks before on-site work

ValidationWhat you needResults
Design and changesCurrent version, approvals, register of deviationsA verified basis for deployment
Equipment and supplyCompleteness, models, versions and statusRegister of readiness and non-conformities
Place of installationAccess, mounting arrangements, heights and environmental conditionsPermission for installation or list of blockers
Backhaul and power supplyStructured cabling system, fiber-optic communication lines, ports, PoE, racks and markingsConfirmed connection points
IntegrationsVLAN, addressing, accesses, authentication and connection points to the systems listed in the approved projectResponsibility and readiness matrix
AcceptanceScenarios, clients, routes, criteria and participantsApproved test program

The deployment process

  1. 01

    Check readiness and document deviations

    We check the project, site, delivery, access and related dependencies; blockers are not masked by installation.

  2. 02

    Install and label equipment

    We work on the current documentation and record the actual location and connections.

  3. 03

    Configure the RF and network components

    Apply the agreed configuration, save versions and backups within the contractual boundaries.

  4. 04

    We connect the agreed integrations

    Verify interfaces, access permissions, and party responsibilities; connect only the systems included in the approved scope.

  5. 05

    We carry out acceptance tests

    Test only the agreed areas, client devices, routes, failure scenarios, and applications.

  6. 06

    We hand over the network for operation

    We hand over as-built documents, access permissions, backups, a register of outstanding issues and defined areas of responsibility.

What the customer receives

  • 01Equipment installed and labeled within the project scope;
  • 02Consistent configuration of WLAN and related components;
  • 03A register of equipment, versions and actual connections;
  • 04Backup copies and access procedure, if it is provided by the contract;
  • 05As-built plans and diagrams;
  • 06Test reports with conditions and results;
  • 07List of deviations and open questions;
  • 08An operational handover package.

What is included and what requires a separate agreement

Included in the base scopeAgree separatelyNot included automatically
Readiness checks, installation, configuration, testing, and as-built documentation within the approved scopeSupply of equipment, structured cabling system, fiber-optic communication lines, construction works, lifting equipmentCorrecting an incomplete design without an agreed change
Version control and recording deviationsSpecial work windows, migration without service interruption, and additional sitesSupport after network handover
Handover of operational documentationIntegration and work of third partiesManufacturer's warranty on equipment from Connectum, unless it is stipulated by the contract

How the deployed network is accepted

CriterionHow to checkWhere we document
Installation and labelingCheck the actual location and connections with the current projectAs-built diagram and equipment register
ConfigurationVerify versions, segments, policies and backups in the agreed compositionConfiguration Control Sheet
Radio layerWe perform measurements according to the approved programMeasurement reports and maps, where included in acceptance
Client device workflowCheck specific devices, routes and applicationsApplication test report
Failure and rollbackCheck only the agreed safe scenariosTest program and change log
HandoverWe verify documents, accesses and areas of responsibilityHandover certificate or checklist

Warranties and the transition to support

Connectum’s workmanship warranty, the manufacturer’s equipment warranty, and technical support are separate commitments. The contract defines the basis, scope, term, exclusions, request channel, and responsible party for each. Support after network handover begins only under a separately agreed service model.

What determines timeframes and cost

The estimate depends on the number and mounting heights of access points, readiness of structured cabling, fiber-optic links and power supply, site conditions, equipment delivery completeness, access arrangements, maintenance windows, integrations, migration requirements, and acceptance test scope. An estimate requires a current design, specification, readiness information, and the proposed phasing.

Questions and answers

Frequently Asked Questions about Wi‑Fi Implementation

01Can you deploy a network designed by another company?

We assess this after reviewing the documentation and contractual rights to use it. Before estimating the work, we check plans, specifications, mounting locations, connections, configuration requirements, contractor responsibilities, and the acceptance program. Gaps and changes are recorded separately. Resolving them is not included in installation until the scope, responsibilities, and current design version are agreed.

02Can work take place at an operating site without downtime?

Phased work can accommodate maintenance windows and critical services, but zero downtime cannot be promised before the architecture and dependencies have been assessed. For each change, we agree on the expected impact, backups, switching sequence, success criteria, and rollback procedure. Site, customer, and related system restrictions are documented before work begins and incorporated into the deployment program.

03What should the customer prepare?

Deployment requires a current design, agreed site access, prepared mounting locations, backhaul and power infrastructure, or a clear allocation of responsibility for these tasks. Responsible contacts must also be appointed for the LAN, information security, authentication, applications, and acceptance. If the customer or another contractor supplies equipment, completeness, models, versions, delivery condition, and responsibility for discrepancies are checked before installation.

04What documents are transferred after implementation?

The contract defines the as-built documentation package. It may include plans and diagrams, an equipment and connection register, configuration versions, backups in an agreed format, test reports, a list of deviations and operating instructions. Passwords, keys and other sensitive information are excluded from the general archive and transferred separately through a secure procedure agreed in advance.

05How are the guarantees for work and equipment divided?

Connectum's warranty on its own work, the manufacturer's or supplier's equipment warranty and subsequent technical support have different grounds, periods and exclusions. The contract separately defines who handles requests, what qualifies as a warranty case, required documents, permissible changes and diagnostic procedures. Support does not start automatically after network handover; it is arranged under a separately agreed service model.

06What happens if the network fails acceptance testing?

Each deviation is recorded against a specific criterion, the test conditions, and the current design version. We then identify the possible cause and the party responsible for the next action, whether it concerns installation, configuration, inputs, equipment, or a related system. Retesting follows the agreed correction. Additional work, design changes, and extensions to the original scope are agreed separately before implementation.

The next step

We will check deployment readiness

Send up-to-date design, specification, site plans, structured cabling system readiness and power supply, access restrictions and desired stage. We will return the list of missing data and evaluation boundaries.