Outdoor areas lack connectivity
The warehouse has coverage, but the yard, apron, or quay has coverage gaps and unstable backhaul.
Unified network of logistics facilities
We design wireless infrastructure for open areas, warehouses, gates, administrative zones and mobile terminal equipment. For each process, we determine the requirements for radio access and the backbone, and the result is checked by zone measurements and route tests.
Backbone → WLAN → mobile client → management → route test
Terminal wireless infrastructure connects outdoor areas, warehouses, gates, administrative spaces, and mobile equipment. WLANs, wireless and wired backbones, onboard clients, segmentation, and monitoring are designed together. Technologies are selected for each area and application.
Signs that a solution is needed
The warehouse has coverage, but the yard, apron, or quay has coverage gaps and unstable backhaul.
Cranes, forklifts and tractors interrupt telemetry when moving between zones.
Warehouse, gate, office and outdoor area use unrelated management schemes.
Failure of a backbone or node disrupts several technological processes.
Engineering constraints
Distances, terrain, buildings and machinery affect the placement of nodes and transport.
Routes, speed, antennas and onboard clients set a separate scenario.
Handheld terminals, video, telemetry and control require different bandwidth and latency.
Masts, cranes, power, vibration, climate and access for maintenance are taken into account in advance.
Redundancy is determined by the impact of a failure on a particular process.
Zones of the terminal
Open coverage for equipment, employees, video and technology services.
WMS, handheld terminals, printers, forklifts and control operations.
On-board terminals, telemetry and data transmission on a moving asset.
Corporate and guest access with individual policies.
Multilayer architecture
PtP/PtMP wireless links, fiber, or hybrid connections between areas.
Access points and channel plan for warehouse, office and outdoor area.
On-board units, antennas and routes of equipment.
Separation of technological, corporate, guest and video traffic.
Monitoring, configuration, events and recovery scenarios.
Selection by zone
| Mechanism | What it does | What we check |
|---|---|---|
| Centrally Managed WLAN | Connects standard Wi‑Fi clients in rooms and open areas, where applicability is confirmed by calculation and survey. | Coverage, capacity, client devices, mobility, and mounting conditions. |
| Industrial mesh | Mesh topology can be used in suitable distributed scenarios. | Capacity per wireless hop, routing, resilience, and mobile client compatibility. |
| P2P/P2MP | The backbone between remote areas and sites. | Path profile, frequency, bandwidth, and link margin. |
| Private LTE network | May provide mobile radio access over a large site where spectrum and regulatory conditions permit. | Frequencies, terminals, delay, integration, operation and economy. |
Stages of the project
Define the site, applications, client devices, routes and result criteria.
We study plans, existing infrastructure, RF environment and location restrictions.
Choose the technology, calculate the coverage and transport, form the scheme and specification.
Deploy multi-level terminal infrastructure, integrate management, policies and monitoring.
We check the agreed zones, routes and applications, transfer protocols and documentation.
Results
Acceptance
| Criterion | How to check | Where we document |
|---|---|---|
| Zones | Coverage and load measurements according to the agreed map. | Heat maps and protocol. |
| Routes of equipment | Test drives with an actual client and operational traffic profile. | Route test logs and, with hardware support, connection or roaming events. |
| Backbone | Load test and verification of agreed failure scenarios. | Link and failover test report. |
Operation
Backbone, radio access, and mobile client status are visible in one monitoring environment.
New routes, equipment and construction are assessed by the impact on the radio network.
Depend on the availability of the source data, access to the facility, the composition of the infrastructure and the need for the pilot. Stages and control points are fixed before the start of work.
It is formed after clarifying the geography, application requirements, equipment composition, works and integrations. The estimates separate mandatory and optional parts.
Support arrangements, response targets, monitoring, spare equipment, and escalation are agreed according to system criticality.
Questions and answers
Equipment cannot be selected from the terminal’s total area alone. Outdoor areas, warehouses, administrative buildings, and equipment routes differ in client devices, density, interference, mounting conditions, and application requirements. Each area receives a suitable RF design, coordinated within the overall architecture. Surveys, calculations, and agreed acceptance criteria determine the final equipment mix.
The method depends on the equipment class and application and is selected after reviewing available onboard clients. Mounting location, antennas, power supply, vibration, speed, routes, and maintenance are assessed together with the RF layer. Suitability is confirmed only after testing target equipment or an agreed equivalent with documented settings and acceptance criteria.
The backbone forms part of the overall architecture. Whether a separate design is required depends on the existing infrastructure. We check routes, capacity, redundancy, power supply, and connection points, then determine whether the existing backbone is sufficient or a new design is needed. Fiber, PtP/PtMP, and other links are considered according to actual site conditions and verified suitability.
Selection depends on topology, client mobility, the available backbone, permitted wireless hop count, capacity, and failure scenarios. A large area alone does not justify mesh, and WLAN is not limited to indoor use. We compare application requirements and operating conditions for each area, then validate the design through surveys, a pilot where needed, and agreed tests.
Modernization may be phased by area and service window, but continuity can be assessed only after reviewing the site and terminal processes. Before work begins, we document access restrictions, temporary switching, work at height, equipment access, and related system dependencies. Each stage includes verification, rollback procedures, and operational handover.
We collect conditions for each area: temperature, precipitation, wind, dust, possible salt spray, vibration, lightning protection, power supply, and maintenance access. These determine equipment, antenna, cable, and mount ratings and installation methods. Surveys and project documentation confirm requirements. Conditions in one area cannot automatically be applied across the whole terminal or another site.
For each equipment class, we agree on the route, operating speed, onboard client, antenna, mounting location, and traffic profile. Tests record network metrics, connection events, and application behavior in representative areas. Results apply to the tested configuration and are included in the acceptance report with test conditions, criteria, and the equipment list.
Provide a site plan and boundaries, areas and processes, equipment classes and routes, and applications with connectivity requirements. Include existing WLAN, fiber and radio links, power supply, mounting locations, access restrictions, and planned site changes. Missing inputs, survey needs, and file formats are clarified before a proposal is prepared.