Communication is unstable in work areas
On the plan, the area is covered, but metal, equipment and interference create dips on actual routes.
Wireless infrastructure for production
We design and deploy industrial Wi‑Fi for workshops, production warehouses, and outdoor areas. The design accounts for metal structures, interference, climate, mobile client devices, and process application requirements. We verify performance using agreed devices, routes, and load scenarios, with acceptance criteria documented before design begins.
Client devices → radio access → backhaul → core → management
Industrial Wi‑Fi is wireless infrastructure designed for a specific site and its process applications. Beyond equipment ratings, the design accounts for metal, interference, temperature, dust, vibration, power supply, movement routes, and the acceptable impact of connection loss on operations. We select the architecture after reviewing project inputs and, where needed, field measurements.
Signs that a solution is needed
The problem is manifested in the technological process: data comes with a delay, mobile equipment loses a session, and the coverage changes with the site.
On the plan, the area is covered, but metal, equipment and interference create dips on actual routes.
Data from terminals, sensors or mobile equipment comes with pauses and requires re-transmission.
Handheld terminals, industrial tablet or onboard terminal loses session when moving between zones.
There is no current scheme, monitoring, unified configuration and clear quality criteria.
Engineering constraints
The same specification does not produce the same result in a workshop, warehouse, and outdoor area.
Reflections, shielding, and changing geometry affect signal strength and multipath.
Equipment protection ratings, operating temperature ranges, heating, and connection protection are selected for the installation location.
The channel plan is built after measurements of the RF environment and takes into account neighboring networks and technological sources of interference.
Voice, video, telemetry, and control have different requirements for latency, loss, and availability.
The speed, route, type of antenna, and behavior of the client device affect the transition between nodes.
For each point, the channel to the core, redundancy, PoE or local power and service conditions are checked.
Scenarios
The architecture is scaled from a separate production building to a distributed site.
Access for terminals, mobile workplaces, diagnostics and technology applications.
Communication between remote areas, nodes and mobile equipment.
Data transfer between WMS, handheld terminals, forklifts and label printers.
The wireless network is used as a transport for telemetry, IIoT and dispatching systems and is designed to meet the requirements of these applications. Implementation of IIoT applications is not part of this solution.
Reference architecture
The final scope is defined after the survey, with each layer designed as part of one coordinated system.
Handheld terminals, tablets, cameras, controllers, sensors and onboard terminals.
Access points, industrial nodes, antennas and an agreed channel plan.
Structured cabling system, fiber-optic communication lines, wireless bridges or wireless mesh backbone.
Switching, routing, segmentation, security and prioritization of traffic.
Controller, logging, status monitoring and operational procedures.
Choice of technology
Technology selection depends on site layout, mobility, latency, spectrum, the client device mix, and the operating model.
| Mechanism | What it does | What we check |
|---|---|---|
| Controller-based Wi‑Fi network | High bandwidth and a wide range of client devices. | Coverage, density, roaming, and compatibility with the specific client devices. |
| Industrial mesh | Connects distributed and mobile nodes, can form a wireless backbone. | Paths, number of wireless hops, and stability as the topology changes. |
| Private LTE network | Gives a mobile environment over a large area and a managed access model. | Available spectrum, permissions, latency, devices, and total cost of ownership. |
| PtP / PtMP | Provides fixed backbone links between remote locations. | Line of sight, bandwidth, redundancy, and mounting conditions. |
Stages of the project
Document geometry, processes, client devices, applications, routes and installation restrictions.
We inspect the site, analyze the RF environment and check the intended locations.
Develop the RF model, channel plan, backhaul and power diagrams, specification, and acceptance program.
We agree on the composition of the equipment, software versions, completeness and installation conditions.
Deploy infrastructure, segmentation, access policies and monitoring.
Check the agreed zones, routes, devices and applications, document the result in the protocol.
Results of the project
The exact set of documentation, configurations, protocols and operational materials is determined by the contract and the acceptance program.
Acceptance
Thresholds are agreed before design and depend on the workflow.
| Criterion | How to check | Where we document |
|---|---|---|
| Coverage | Verification measurements at the operating height and in the agreed zones. | Heat map and measurement protocol. |
| Mobility | Walk or drive the operating route with an actual client device. | Transition log and application test results. |
| Application | Transfer test traffic with a specified load profile. | Latency, packet loss, and session availability measurements. |
| Resilience | We check the agreed switching scenario on the stand or in the selected work window. Tests on the existing network are carried out only according to the approved program. | Test program, event log and recorded network behavior. |
The schedule depends on site size and location, access to working areas, plan completeness, field measurements and pilots, equipment ratings, and installation windows. Survey, design, delivery, commissioning, and acceptance are planned as separate stages.
The cost is affected by the number of zones and routes, client device classes, application requirements, the state of the structured cabling system, fiber-optic communication lines, power supply and backbone network, installation conditions, equipment composition and volume of as-built documentation. Mandatory and optional parts are shown separately.
The support scope reflects how critical the production process is. The SLA defines monitored parameters, incident registration and escalation, response targets, change windows, configuration backups, and spare equipment requirements. Service arrangements and response targets are recorded in the agreed SLA.
After changing the layout, equipment, routes or geography of the site, we re-check the affected areas and update the coverage map.
Questions and answers
Industrial design accounts for process applications, metal, interference, climate, vibration, power supply, movement routes, and operational requirements. Equipment ratings matter, but do not by themselves ensure the required connectivity. Performance criteria are defined for the process and verified on site. Equipment, placement, and acceptance testing are therefore selected for the actual conditions.
Plans can support a preliminary model and an estimate of the project scope. A complex or critical environment usually requires an inspection and field measurements: actual materials, equipment, interference sources, and mounting locations may differ from the drawings. The need for a site visit is assessed after reviewing project inputs.
Provide site plans or a layout, heights and materials, working areas, client device models, applications, movement routes, latency and packet loss requirements, existing wired infrastructure, power supply, and installation restrictions. We identify any missing information. These inputs help define the survey, calculations, and next-stage scope before equipment is selected.
No. A controller-managed Wi‑Fi network may suit an indoor building, while mesh or wireless bridges may suit a distributed site. Private LTE or specialized clients may be considered for particular mobility requirements. Selection depends on geography, applications, spectrum, available devices, and the operating model. We compare options after documenting routes, traffic profiles, availability requirements, and site restrictions.
Yes, if it meets the design requirements. Before incorporating existing infrastructure, we check capacity, PoE, redundancy, cable condition, mounting locations, switching, segmentation, and monitoring. Components may be retained, upgraded, or replaced according to their condition, compatibility, and role in the agreed architecture.
Work can often be divided into areas and maintenance windows. Feasibility, switching order, and permitted interruptions are agreed after assessing the live network and production schedule. Critical areas require an advance switching and rollback plan. The sequence depends on architecture, equipment access, process requirements, and permitted changes during operating hours.
Before design, we document areas, operating heights, devices, routes, applications, and acceptable performance. After deployment, we perform verification measurements, application tests, and agreed redundancy checks. The contract and acceptance program define reporting materials, which may include heat maps, measurement logs, and a test report.
Equipment relocation, route changes, new client models, and firmware updates can affect the RF environment and roaming. We assess changes before broad deployment and retest affected areas and workflows. Support procedures may include this process. The checks depend on the scale of the change, application criticality, and agreed acceptance criteria.
The next step
Send a site plan, process applications, device models, movement routes, and areas where connectivity is critical. The Connectum team will check the inputs and propose the next stage: preliminary modeling, a survey, or a pilot.
Material prepared by Connectum technical team · updated: August 2026